2020 12 02 Soil Background Evaluation Report OCR (pdf)
2020 12 02 DVSR EDD Rev 1 for Semi Annual Report OCR (pdf)
2020 12 02 DVSR EDD for RI Mod 4 to 9 OCR (pdf)
2020 12 02 CIP Reversion3 OCR (pdf)
2020 11 18 NERT Response to NDEP July Letter OCR (pdf)
2020 11 04 Semi Annual Report OCR (pdf)
2020 11 04 RTC on Phase 6 Model OCR (pdf)
2020 10 28 NERT Phase 3 Mod 11 SWF Area RI OCR (pdf)
2020 10 08 SWF BIO Annual Report Revised and DVSR OCR (pdf)
2020 10 08 Hydrogen Based Gas Permeable OM OCR (pdf)
2020 09 28 Time Extension Request for Submittal of OU 1 Soil BHRA OCR (pdf)
2020 09 17 NDEP Response to SMP Annual Report June 1 2019 May 31 2020 OCR (pdf)
2020 08 26 NDEP Response to Contingency Plan for GW 11 Investigation Berm Investigation OCR (pdf)
2020 08 04 Revised Greener Remeidation Workplan BMP OCR (pdf)
2020 07 31 NERT's Letter on Phase 3 RI dated Oct 27 2017 OCR (pdf)
2020 07 29 Revised DVSR EDD for ZVI TS OCR (pdf)
2020 07 29 Quality Assurance Project Plan Revision 5 OCR (pdf)
2020 07 29 NDEP Response to NERTs Letter on Phase 3 RI dated on Oct 27 2017 OCR (pdf)
2020 07 22 NERT Phase 6 Model OCR (pdf)
2020 07 22 DVSR Galleria Drive Bioremediation Treatability Study Closure Revision 1 OCR (pdf)
2020 07 09 SWF BIO Annual Report OCR (pdf)
2020 07 08 NDEP Las Vegas Office Change of Address OCR (pdf)
2020 06 15 NDEP Response to Hydrogen Gas Permable Membrane Pilot Study OCR (pdf)
2020 06 10 DVSR SWF Bio TS 2019 Annual Progress Report OCR (pdf)
2020 06 10 DVSR 2019 LVW ZVI OCR (pdf)
2020 06 09 BHRA Report for OU 1 Soils OCR (pdf)
2020 05 11 RTCs on In Situ Bioelectrochemical Laboratory Scale TS OCR (pdf)
2020 05 11 Phase 3 Remedial Investigation Modification No 10 High Frequency SW Sampling LVW OCR (pdf)
2020 05 11 Phase 2a Results and Final Closeout Galleria Drive Bioremediation Treatability Study OCR (pdf)
2020 05 11 Ex situ Zero Valent Iron (ZVI) Technology OCR (pdf)
2020 04 29 DVSR RI Sampling Phase 2 March 2018 through March 2019 Rev 1 OCR (pdf)
2020 04 29 DVSR and EDD for Phase 2a Results and Final Closeout Galleria Dr Bioremediation TS OCR (pdf)
2020 04 27 Phase 2a Results and Final Closeout Galleria Dr Bioremediation TS OCR (pdf)
2020 04 09 SAP Rev 1 OCR (pdf)
2020 04 09 DVSR Phase 2 RI Rev 1 OCR (pdf)
2020 04 09 Annual Performance Report 2019 OCR (pdf)
2020 03 30 Parcel E Asbestos DVSR OCR (pdf)
2020 03 24 IN SITU BIOREMEDIATION INJECTIONS Field Document OCR (pdf)
2020 03 23 Bioelectrochemical Lab Study Results OCR (pdf)
2020 03 20 Revised Phase 3 RI Mod 8 OCR (pdf)
2020 03 16 NERT Revised Pages for QAPP Revision 4 OCR (pdf)
2020 03 16 NERT Report of Soil Removal Action Dioxin Soil Removal Area OCR (pdf)
2020 03 16 NERT Remedial Performance Groundwater SAP Revision 1 OCR (pdf)
2020 03 16 NERT Annual Remediation Performance OCR (pdf)
2020 02 20 NERT QAPP Revision 4 OCR (pdf)
2020 02 18 NERT Phase 3 Remedial Investigation Modification No 8 OCR (pdf)
2020 01 21 H 000539 NERT Site Management Plan Revision 5 (pdf)
2020 01 13 Unit Building 4 and 5 Investigation Report Reversion OCR (pdf)
2020 01 13 DVSR EDD Annual Performance Report for Period Jan to Jun 2019 OCR (pdf)
2020 01 03 DVSR RI Sampling Phase March 2018 through March 2019 OCR (pdf)

Create a new folder